ANNEX 6. PERMISSION TREE FOR ACCESS TO PLAN-R FUNCTIONS

The permission tree for access to PLAN-R functions is shown below. Permissions available free of charge are highlighted in green in the table.

Table "Permission Tree for Access to PLAN-R Functions"

No. Permission code Function access description
1 F1 Personal account
2 F1.1 Edit value of estimated attributes
3 F1.2 Assignments
4 F2. Enterprise
5 F2.1 Information panel
6 F2.1.1 Node card
7 F2.1.1.1 Edit EPS node attribute values
8 F2.1.2 Analytics
9 F2.1.2.1 Edit analytics
10 F2.1.2.2 Print analytics
11 F2.1.2.3. Edit local analytics view
12 F2.1.2.4. Edit global analytics view
13 F2.1.3 Documents
14 F2.1.3.1 Edit document attributes
15 F2.1.3.2 Document view settings
16 F2.1.4 Reports
17 F2.1.4.1 Add and delete reports
18 F2.1.4.2 Generate reports
19 F2.1.4.3 Set report visibility
20 F2.1.5 Passport
21 F2.1.5.1 Edit passport
22 F2.1.6 Feed
23 F2.1.7 Chat
24 F2.1.7.1 Send messages in chat
25 F2.2 Enterprise settings panel
26 F2.2.1 EPS settings
27 F2.2.2 EPS element settings
28 F2.2.2.1 Common settings
29 F2.2.2.2 Schedules links
30 F2.2.2.3 Link indicators
31 F2.2.2.4 Tasks indicators
32 F2.2.2.5 Notification settings
33 F2.2.2.6 Edit Consumption Curves
34 F2.2.3 Backup and restore projects
35 F2.2.4 Export projects
36 F2.2.4.1 Import projects
37 F2.2.5 Export schedule versions
38 F2.2.5.1 Import schedule versions
39 F2.2.6 Copy/paste schedule versions
40 F2.2.7 Space management
41 F2.2.7.1 Invite/disconnect users in space
42 F2.2.7.2 Assign users to EPS elements
43 F2.2.7.3 User role settings
44 F2.2.7.4 Automatic backup settings for projects/schedules
45 F2.2.7.5 Space user activity analytics
46 F2.2.8 Set schedule version statuses
47 F2.2.9 Consolidated schedule
48 F2.2.9.1 Create/update consolidated schedule
49 F2.2.9.2 Consolidated schedule generation rules settings
50 F2.2.10 Budget
51 F2.2.10.1 Create/update budget
52 F2.2.10.2 Budget generation rules settings
53 F2.2.11 Exchanging schedule versions between spaces
54 F3 Schedule
55 F3.1 Edit schedule
56 F3.1.1 Timetable calculation
57 F3.1.2 Manage Work Breakdown Structure
58 F3.1.2.1 Manage Tasks
59 F3.1.2.1.1 Move Tasks
60 F3.1.2.1.2 Add Tasks
61 F3.1.2.1.3 Delete Tasks
62 F3.1.2.1.3.1 Delete Tasks with Posted Actuals
63 F3.1.2.1.4 Change Task Type
64 F3.1.2.2 Manage Structure
65 F3.1.2.2.1 Move Work Breakdown Structure Nodes
66 F3.1.2.2.2 Add Work Breakdown Structure Nodes
67 F3.1.2.2.3 Delete Work Breakdown Structure Nodes
68 F3.1.2.2.4 Change Work Breakdown Structure Node Type
69 F3.1.3 Edit activities links
70 F3.1.4 Edit, export/import of directory entries assignments for activities
71 F3.1.5 Global attribute replacement
72 F3.1.6 Assign directory entries to activity attributes
73 F3.1.7 Assign directory entries to other schedule versions
74 F3.1.8 Update baseline data and indicators
75 F3.1.9 Edit baseline
76 F3.2 Work with schedule
77 F3.2.1 Support schedules
78 F3.2.2 Directory assignments
79 F3.2.2.1 Editing reference book assignments on tasks
80 F3.2.2.1.1 Assigning/deleting reference book assignments on tasks
81 F3.2.2.1.1.1 Bulk add/delete custom directory wbs on tasks
82 F3.2.2.2 Synchronize assignments with the current directory
83 F3.2.3 Resources planning
84 F3.2.3.1 Enter accepted plan
85 F3.2.3.2 Enter operational plan
86 F3.2.3.3 Enter actuals
87 F3.2.3.4 Accept actuals
88 F3.2.3.5 Visibility of physical volume
89 F3.2.3.6 Visibility of labor units
90 F3.2.3.7 Visibility of cost
91 F3.2.3.8 Visibility of resources
92 F3.2.3.9 Export/import EPS reporting forms
93 F3.2.3.10 Manage resource assignments
94 F3.2.3.10.1 Add resource assignments
95 F3.2.3.10.2 Delete resource assignments
96 F3.2.3.10.2.1 Delete Assignments with Actuals
97 F3.2.3.10.3 Replace Assignments
98 F3.2.3.10.4 Bulk add/delete resource assignments
99 F3.2.3.11 Editing resource attributes
100 F3.2.3.12 Editing resource assignment attributes
101 F3.2.3.13 Editing distributed labor constants
102 F3.2.3.14 Editing a distributed rate
103 F3.2.4 Photos and documentation
104 F3.2.4.1 Import photos and documents
105 F3.2.4.2 Delete photos and documents
106 F3.2.5 Assignments
107 F3.2.5.1 Create assignments
108 F3.2.5.1.1 Bulk add personal wbs assignments
109 F3.2.6 Network diagrams
110 F3.2.7 Cyclograms
111 F3.2.8 Setting up layouts and printing schedule
112 F3.2.8.1 Setting global print layouts in PDF
113 F3.2.9 Activities passport
114 F3.2.9.1 Edit activities passport
115 F3.2.10 Checklists
116 F3.2.10.1 Assignment checklists on activities
117 F3.2.10.1.1 Bulk add/delete checklists
118 F3.2.10.2 Edit checklists status
119 F3.2.10.3 Edit checklists templates
120 F3.2.11 Kanban boards
121 F3.2.11.1 Create kanban boards
122 F3.2.11.2 Filling kanban boards
123 F3.2.11.3 Changing kanban board status
124 F3.2.11.4 Delete kanban boards
125 F4 Project screen
126 F4.1 General line
127 F4.2 Key activities
128 F4.3 Control points
129 F4.4 Project screen settings
130 F5 Scoreboard
131 F5.1 Time display
132 F5.2 Cost display
133 F5.3 Scoreboard settings
134 F6 Enterprise resources
135 F7 Directories
136 F7.1 System directories
137 F7.1.1 Editing the Units of Measurement directory
138 F7.1.2 Editing the Participants directory
139 F7.2 Custom directories
140 F7.2.1 Editing custom directories
141 F7.2.2 Updating custom directory assignments
142 F7.3 Resource directories
143 F7.3.1 Editing resource directories
144 F7.4 RBS
145 F7.4.1 Editing RBS
146 F7.4.2 Update on RBS assignments
147 F8 Attributes
148 F8.1 Activity attribute settings
149 F8.1.1 Set up visibility and edit rights by role for activity attributes
150 F8.2 EPS attribute settings
151 F8.3 Document attribute settings
152 F8.4 Setting up destination attributes
153 F9 Calendars
154 F9.1 Calendar settings
155 F9.2 Assign default calendars
156 F10 Schedule view settings
157 F10.1 Creating global views
158 F10.2 Deleting global views
159 F11 BIM-R
160 F11.1 Import models
161 F11.2 Edit model attributes
162 F11.3 Create model elements
163 F11.4 Link model elements to activities
164 F12 COST-R
165 F12.1 Import initial budgets
166 F12.2 Create enlargement rules
167 F12.3 Create schedule template from contract budget
168 F12.4 Edit COST-R EPS settings
169 F13 AI-R

608.0-5d1f26c7