ANNEX 1. PERMISSION TREE FOR ACCESS TO PLAN-R FUNCTIONS

No. Permission code Function access description
1 F1 Personal account
2 F1.1 Edit value of estimated attributes
3 F1.2 Assignments
4 F2. Enterprise
5 F2.1 Information panel
6 F2.1.1 Node card
7 F2.1.1.1 Edit EPS node attribute values
8 F2.1.2 Analytics
9 F2.1.2.1 Edit analytics
10 F2.1.2.2 Print analytics
11 F2.1.2.3. Edit local analytics view
12 F2.1.2.4. Edit global analytics view
13 F2.1.3 Documents
14 F2.1.3.1 Edit document attributes
15 F2.1.3.2 Document view settings
16 F2.1.4 Reports
17 F2.1.4.1 Add and delete reports
18 F2.1.4.2 Generate reports
19 F2.1.4.3 Set report visibility
20 F2.1.5 Passport
21 F2.1.5.1 Edit passport
22 F2.1.6 Feed
23 F2.1.7 Chat
24 F2.1.7.1 Send messages in chat
25 F2.2 Enterprise settings panel
26 F2.2.1 EPS settings
27 F2.2.2 EPS element settings
28 F2.2.2.1 Common settings
29 F2.2.2.2 Schedules links
30 F2.2.2.3 Link indicators
31 F2.2.2.4 Tasks indicators
32 F2.2.2.5 Notification settings
33 F2.2.2.6 Edit Consumption Curves
34 F2.2.3 Backup and restore projects
35 F2.2.4 Export projects
36 F2.2.4.1 Import projects
37 F2.2.5 Export schedule versions
38 F2.2.5.1 Import schedule versions
39 F2.2.6 Copy/paste schedule versions
40 F2.2.7 Space management
41 F2.2.7.1 Invite/disconnect users in space
42 F2.2.7.2 Assign users to EPS elements
43 F2.2.7.3 User role settings
44 F2.2.7.4 Automatic backup settings for projects/schedules
45 F2.2.7.5 Space user activity analytics
46 F2.2.8 Set schedule version statuses
47 F2.2.9 Consolidated schedule
48 F2.2.9.1 Create/update consolidated schedule
49 F2.2.9.2 Consolidated schedule generation rules settings
50 F2.2.10 Budget
51 F2.2.10.1 Create/update budget
52 F2.2.10.2 Budget generation rules settings
53 F2.2.11 Exchanging schedule versions between spaces
54 F3 Schedule
55 F3.1 Edit schedule
56 F3.1.1 Timetable calculation
57 F3.1.2 Edit activities/events structure
58 F3.1.2.1 Editing the composition of tasks
59 F3.1.2.2 Editing the task breakdown structure
60 F3.1.2.2.1 Adding/removing works
61 F3.1.2.2.2 Changing the type of a wbs element
62 F3.1.3 Edit activities links
63 F3.1.4 Edit, export/import of directory entries assignments for activities
64 F3.1.5 Global attribute replacement
65 F3.1.6 Assign directory entries to activity attributes
66 F3.1.7 Assign directory entries to other schedule versions
67 F3.1.8 Update baseline data and indicators
68 F3.1.9 Edit baseline
69 F3.2 Work with schedule
70 F3.2.1 Support schedules
71 F3.2.2 Directory assignments
72 F3.2.2.1 Editing reference book assignments on tasks
73 F3.2.2.1.1 Assigning/deleting reference book assignments on tasks
74 F3.2.2.2 Synchronize assignments with the current directory
75 F3.2.3 Resources planning
76 F3.2.3.1 Enter accepted plan
77 F3.2.3.2 Enter operational plan
78 F3.2.3.3 Enter actuals
79 F3.2.3.4 Accept actuals
80 F3.2.3.5 Visibility of physical volume
81 F3.2.3.6 Visibility of labor units
82 F3.2.3.7 Visibility of cost
83 F3.2.3.8 Visibility of resources
84 F3.2.3.9 Export/import EPS reporting forms
85 F3.2.3.10 Edit assigned resource composition
86 F3.2.3.11 Editing resource attributes
87 F3.2.3.12 Editing resource assignment attributes
88 F3.2.3.13 Editing distributed labor constants
89 F3.2.3.14 Editing a distributed rate
90 F3.2.4 Photos and documentation
91 F3.2.4.1 Import photos and documents
92 F3.2.4.2 Delete photos and documents
93 F3.2.5 Assignments
94 F3.2.5.1 Create assignments
95 F3.2.6 Network diagrams
96 F3.2.7 Cyclograms
97 F3.2.8 Setting up layouts and printing schedule
98 F3.2.8.1 Setting global print layouts in PDF
99 F3.2.9 Activities passport
100 F3.2.9.1 Edit activities passport
101 F3.2.10 Checklists
102 F3.2.10.1 Assignment checklists on activities
103 F3.2.10.2 Edit checklists status
104 F3.2.10.3 Edit checklists templates
105 F3.2.11 Kanban boards
106 F3.2.11.1 Create kanban boards
107 F3.2.11.2 Filling kanban boards
108 F3.2.11.3 Changing kanban board status
109 F3.2.11.4 Delete kanban boards
110 F4 Project screen
111 F4.1 General line
112 F4.2 Key activities
113 F4.3 Control points
114 F4.4 Project screen settings
115 F5 Scoreboard
116 F5.1 Time display
117 F5.2 Cost display
118 F5.3 Scoreboard settings
119 F6 Enterprise resources
120 F7 Directories
121 F7.1 System directories
122 F7.1.1 Editing the Units of Measurement directory
123 F7.1.2 Editing the Participants directory
124 F7.2 Custom directories
125 F7.2.1 Editing custom directories
126 F7.2.2 Updating custom directory assignments
127 F7.3 Resource directories
128 F7.3.1 Editing resource directories
129 F7.4 RBS
130 F7.4.1 Editing RBS
131 F7.4.2 Update on RBS assignments
132 F8 Attributes
133 F8.1 Activity attribute settings
134 F8.1.1 Set up visibility and edit rights by role for activity attributes
135 F8.2 EPS attribute settings
136 F8.3 Document attribute settings
137 F8.4 Setting up destination attributes
138 F9 Calendars
139 F9.1 Calendar settings
140 F9.2 Assign default calendars
141 F10 Schedule view settings
142 F10.1 Creating global views
143 F10.2 Deleting global views
144 F11 BIM-R
145 F11.1 Import models
146 F11.2 Edit model attributes
147 F11.3 Create model elements
148 F11.4 Link model elements to activities
149 F12 COST-R
150 F12.1 Import initial budgets
151 F12.2 Create enlargement rules
152 F12.3 Create schedule template from contract budget
153 F12.4 Edit COST-R EPS settings
154 F13 AI-R