OPENING A SCHEDULE
Click "Schedule" or the schedule name (1) to open its Actual version. To open a specific schedule version within the project, click the required version (2).
Opening a Schedule Version
Click "Schedule" or the schedule name (1) to open its Actual version. To open a specific schedule version within the project, click the required version (2).
Opening a Schedule Version