PROJECT SCREEN INTERFACE STRUCTURE

register imageProject screen interface structure

The interface is divided into three areas: General Lines (1), key activities (2), and control points (3). You can show or hide individual areas as needed (4).

To switch project screen views, click “Settings” (5) and select a previously created view. To modify the view settings, click “Screen settings” (6).

To change the zoom level, hold down the right mouse button in the timeline area (7) and drag left to zoom out or right to zoom in.

To scroll horizontally, hold down the right mouse button in the project timeline area and move the visible area in the required direction.

Project General Line

register imageProject General Lines

The General Line area contains two timeline lines showing the project’s baseline dates (1) and actual dates (2). Key events appear as circles on the lines (3). Key event names are displayed below the line showing actual project dates.

By default, key events on the project’s actual line use the following colors:

  • Blue (3) — completed on or before the baseline date specified in the Baseline schedule version; deviation is greater than or equal to 0;
  • Red (4) — completed after the baseline date specified in the Baseline schedule version; deviation is less than 0;
  • Yellow (5) — the forecast date specified in the Actual schedule version is later than the baseline date specified in the Baseline schedule version; deviation is less than 0;
  • Green (6) — the forecast date specified in the Actual schedule version is on or before the baseline date specified in the Baseline schedule version; deviation is greater than or equal to 0;
  • Light red (7) — execution is delayed: the activity or milestone finish date is earlier than both the current date and the schedule’s update date;
  • Dark gray (8) — execution may be delayed or the data may be out of date: the activity or milestone finish date is earlier than the current date but later than the schedule’s update date.

To view the color legend, hover over the question mark (9).

You can change key event colors in the “Project screen settings” window. Click “Settings” (1), open the settings of an existing project screen (2), and click “Customize color scheme” (3). In the “Color scheme of key events” window (4), select the item to edit (5) and choose a color from the palette or spectrum (6). You can also restore the default color settings (7). Click “Save” (8) to save and apply the selected settings.

register imageConfiguring the key event color scheme

To configure the key event view, click the corresponding button (1). In the window that opens, select the main and additional attributes to display for the event. Select the checkboxes next to the required attributes (2) and click “Save” (3). A search function (4) is available to help you find additional attributes.

register imageConfiguring the key event view

For each key event that has predecessor activities in its schedule, PLAN-R automatically creates a chain of driving and non-driving predecessors. Click the key event on the project’s actual line to show or hide its predecessor activities.

Predecessor activities are represented by circles and lines extending from them. A circle represents the predecessor activity’s start, while the line represents its current duration and finish. Predecessor activity elements use the same color rules as key events.

To expand the predecessor activity chain, click the required key event with the left mouse button. PLAN-R displays the following information for key event predecessors:

  • predecessor activity name;
  • predecessor activity dates in the Baseline version of its schedule;
  • predecessor activity dates in the Actual version of its schedule;
  • predecessor activity identifier;
  • deviation of the predecessor activity’s finish in the Actual schedule version from its finish in the Baseline schedule version;
  • project indicators, if the activity has any.

Key Activities

register imageProject key activities

The Key activities area displays activities positioned according to their dates in the Actual versions of the schedules where they are identified as key activities. Key activities can be grouped into functional sections (1). To display these sections, select a section attribute for key activities in the project screen settings.

Each key activity displays its name (2) and start and finish dates (3). Activity progress is shown by a blue fill. If activities have relationships in the schedule, those relationships also appear in the “Project screen” interface.

Any schedule activity can be designated as a key activity. The criteria for selecting key activities are defined at the company level. Typically, key activities are those that may cause losses or require additional analysis and monitoring.

Control Points

register imageProject control points

Control points appear in the Key activities area (1) and as a list in the right sidebar (2). They are displayed as circular indicators with continuous numbering (3).

A control point’s position in the Key activities area is determined by the position of its assigned activity and the date specified in the directory assignment attribute. If the control point falls outside the activity’s date range, dashed lines extend from the activity’s start or finish to the control point.

The right sidebar lists control points by group, starting with risks. Each control point includes a number, event date, and description.

Project Analysis Using Artificial Intelligence

PLAN-R allows you to analyze a project screen using artificial intelligence (AI). Open the “AI” section (1), select a General Line element (2), choose an AI model from the drop-down list (3), and select an analysis scenario (4). Then click “Analyze” (5).

The analysis result appears in the output area (6). You can copy the text (7), clear the result (8), and view the request history (9).

register imageAnalyzing a General Line element using artificial intelligence