DIRECTORY MANAGEMENT

Creating a New Directory

To create a directory, select the Enterprise Project Structure node (1) in the Scope area where the directory will be available. If you select a parent node, the directory will also be available at all its child nodes.

In the directory list, open the required section (2) and click “Add” (3). In the window that opens, enter the directory name (4) and click “Create” (5). The new directory appears in the selected section.

PLAN-R provides the following directory types:

  • System — directories included in PLAN-R by default;
  • General — a directory for storing reference information. It initially contains “Code” and “Name” attributes. You can add any other attributes as needed;
  • Resource — a directory for storing resource entries. The “Code”, “Name”, “Unit of measure”, “Units/time”, “Rate”, and “Labor constant” attributes are created automatically.

register imageCreating a new directory in PLAN-R

Creating Custom Directory Attributes

To define a directory’s structure, create its own set of attributes. First select its scope (2), select the required directory from the directory list (1), and click “Settings” (3).

register imageDefining the directory structure (1)

In the window that opens, go to “Directory attributes” (4) and click “Add” (5). In the attribute creation window, select the attribute type (6) and enter its name (7).

The following entry attribute types are available:

  • Date;
  • Number;
  • String;
  • Boolean;
  • Related.

After configuring the attribute, click “Create” (8). The new attribute is added to the existing attributes table (9) and appears in the directory contents. To delete an attribute, click the trash button (10). To rename an attribute, double-click its name in the table, enter a new value, and press Enter.

register imageDefining the directory structure (2)

Creating Directory Assignment Attributes

Directory assignment attributes are attributes whose values are entered or edited when a directory row is assigned to a schedule activity or work package, or after the assignment.

To create an assignment attribute for a General directory, open the directory settings and go to “Assignment attributes” (1). Click “Add” (2), then select the attribute type (3) and enter its name (4) in the window that opens.

The following assignment attribute types are available:

  • Date;
  • Number;
  • String;
  • Boolean.

After configuring the attribute, click “Create” (5). The new attribute is added to the existing assignment attributes table (6). To delete an assignment attribute, click the trash button (7). Rename assignment attributes in the same way as directory attributes.

You can add assignment attributes and assign entries to schedule activities only through General directories and an RBS. Resource directory entries cannot be assigned directly to schedule activities.

register imageCreating directory assignment attributes

Populating and Editing a Directory

To populate a directory, select its scope (1) and click “+ Add a entry” (2).

In the window that opens, enter the resource name. For a Resource directory, enter the name (4), select a unit of measure (5) and resource type (6) from the drop-down lists, then click “Add” (7). Click “Next” (8) to create entries consecutively.

When you add a row to a large directory, it automatically appears in the visible area without requiring you to scroll. You can also navigate to the beginning or end of the directory (9).

register imageAdding a directory entry

To enter or edit a value, double-click the required attribute cell in a directory row (1). Use the corresponding buttons to copy (2) and paste (3) a directory row. Use the down (4) and up (5) buttons to change row positions. To delete a directory row, select it and click “Delete” (6).

register imageEditing and deleting a directory entry

Creating a Hierarchical Directory

PLAN-R supports hierarchies in General directories. Resource directory hierarchies are defined in the Resource Breakdown Structure (see “Creating a Resource Breakdown Structure”).

To add a hierarchy to a General directory, select an entry (1) and click “± Add child entry” (2). In the window that opens, enter the child entry name (3) and click “Add” (4). Click “Next” (5) to create child entries consecutively.

When a child entry is added, the parent row displays a button for collapsing or expanding its child entries (6). “Cut” (7) lets you move a child entry to another parent. Select the child entry, click “Cut”, select the new parent entry, and click “Paste” (8). Use the left (9) and right (10) buttons to change the directory row hierarchy.

register imageCreating a child directory entry

Updating Attributes from Directories

When the contents of General directories or an RBS change, you can update or delete List attribute values in schedule versions and directory row assignments to activities.

To update attribute values in bulk, select an Enterprise Project Structure node (1) in the Scope area, select a directory (2), and click “Update assignments” (3). In the “Update values in schedules” window, select the activity statuses (4) for which values need to be updated. In “Update/delete values”, select “Update” (5) from the drop-down list, then select the value type:

  • Directory assignments (6) — updates values of directory rows assigned to activities in the “Directories” section of the schedule workspace;
  • Attributes (List type) (7) — updates List attribute values.

Next, select the schedule version type (8) in which values need to be updated and click “Execute” (9).

register imageUpdating attribute values in schedules

After a successful update, the schedule displays the new directory entries, and the notification “Reference data updated successfully” appears.

To update attribute values in a specific schedule version, follow the same procedure, but first select the required schedule version (1) in the Scope area.

register imageUpdating attribute values in a schedule version

To delete attribute values, select an Enterprise Project Structure node (1) in the Scope area, select a directory (2), and click “Update assignments” (3). In the “Update values in schedules” window, select the activity statuses (4) for which values need to be deleted. In “Update/delete values”, select “Delete” (5), then select the value type to delete (6) and the schedule version type (7). Click “Execute” (8). In the confirmation window, click “Confirm” to delete directory assignments or related activity attribute values.

register imageDeleting attribute values in schedules

Attention! After a directory attribute value is changed or deleted, its previous value can no longer be used for new assignments of the related activity attribute.

If an attribute value or an entire entry has been deleted from the directory, an update clears the related List attribute value or deletes the corresponding directory row assignment.

If the activity attributes being updated are used in calculated attributes or indicators, those calculated attributes or indicators must be recalculated or reset.

Directory Dependencies

Directory dependencies let you use data from one directory—the donor—in another directory—the recipient—without entering it again manually. This ensures consistent information and automatic synchronization between related directories.

To create a directory dependency, open the required directory’s settings. Go to “Directory attributes” (1) and click “Add” (2). In the attribute creation window, select the “Related” type (3).

Select the donor directory (4) from which values will be retrieved, the donor attribute (5), and the attribute field value (6) that will use a value from the other directory’s attribute. Enter a name for the new attribute (7). Click “Create” (8) to save the changes, or “Cancel” (9) to cancel attribute creation or editing.

register imageCreating a Related attribute

The donor directory attribute appears in the selected directory’s contents (1).

To enter or change a value, double-click the cell, select a value (2) in the window that opens, and click “Save” (3). When donor directory attributes change, the data in the related directory updates automatically.

register imageEntering a value in a Related attribute

To clear a Related attribute value, double-click the cell containing the previously assigned entry (1) and click “Reset” (2) in the window that opens.

register imageClearing a Related attribute value

Copying, Moving, Renaming, and Deleting Directories

PLAN-R also allows you to copy, move, and delete directories.

Moving a directory changes its scope in the Enterprise Project Structure. In the Scope area, select the original Enterprise Project Structure node (1), select the required directory (2), and click “Move directory” (3). In the window that opens, use the checkboxes to select the node (4) where the directory will be available, along with all its child nodes. Click “Move” (5) to change the directory’s scope.

register imageMoving a directory

Copying a directory extends its availability in the Enterprise Project Structure by creating copies. In the Scope area, select the original Enterprise Project Structure node (1), select the required directory (2), and click “Copy directory” (3).

In the window that opens, use the checkboxes to select one or more nodes (4) where copies will be available, along with all their child nodes. Enter a name for the directory copy at each selected node (5), then click “Copy” (6). PLAN-R creates the specified directory copies.

register imageCopying a directory

To rename a directory, select an Enterprise Project Structure node, select the required directory, and open “Settings”. In the “General” section (1), change the directory name in the “Name” field (2) and click “Save” (3).

PLAN-R automatically generates and assigns a unique identification key (4) to each new directory.

register imageRenaming a directory

To delete a directory, select an Enterprise Project Structure node (1), select the required directory (2), and click “Remove directory” (3). Confirm deletion (4) in the window that opens. The directory is deleted from PLAN-R.

register imageDeleting a directory