RESOURCE DIRECTORY
A resource directory stores enterprise resources. These resources are required to perform schedule activities and determine their dates, labor requirements, and cost.
A resource directory differs from other directories by its required attributes.
The required system attributes of a resource directory are:
- “Name” (1);
- “Unit of measure” (2);
- “Units/time” (3);
- “Rate” (4);
- “Labor constant” (5);
- “Resource type” (6);
- “Calendar” (7).
The “Resource type” system attribute (6) defines the categories of resources used in a project. It classifies resources as labor, nonlabor, material, or cost resources.
Resource directory
To add a resource directory entry, click “+ Add a entry” (1). In the window that opens, enter the resource name (2), select a unit of measure from the drop-down list (3), select the resource type (4), and click “Add” (5). Click “Next” (6) to create resource directory entries consecutively.
Adding a resource directory entry