RESOURCE DIRECTORY

A resource directory stores enterprise resources. These resources are required to perform schedule activities and determine their dates, labor requirements, and cost.

A resource directory differs from other directories by its required attributes.

The required system attributes of a resource directory are:

  • “Name” (1);
  • “Unit of measure” (2);
  • “Units/time” (3);
  • “Rate” (4);
  • “Labor constant” (5);
  • “Resource type” (6);
  • “Calendar” (7).

The “Resource type” system attribute (6) defines the categories of resources used in a project. It classifies resources as labor, nonlabor, material, or cost resources.

register imageResource directory

To add a resource directory entry, click “+ Add a entry” (1). In the window that opens, enter the resource name (2), select a unit of measure from the drop-down list (3), select the resource type (4), and click “Add” (5). Click “Next” (6) to create resource directory entries consecutively.

register imageAdding a resource directory entry


608.0-5d1f26c7