RESOURCE DISPLAY
In the resource table pane, you can select the resource directory (1) whose resource usage you want to review.
The resource table contains four attributes: “Name”, “Plan”, “Units/time”, and “Unit of measure”. To change their values, open the “Directory library” section and edit the resource directory entries.
A resource’s “Plan” value depends on the activities selected using checkboxes in the Work Breakdown Structure.
The first table column also shows the color (2) representing each resource on the chart. The chart’s color scheme cannot be customized; colors are assigned by the application by default.
To configure the chart’s color scheme, click the required resource’s color icon and select a color from the palette.
The resource table displays status indicators (3):
- Green — “No overallocation”. The resource usage rate does not exceed its specified limit.
- Yellow — “Units/time not specified”. The resource’s units/time value has not been specified in the directory.
- Red — “Overallocated”. The resource’s hourly usage rate exceeds its specified limit. When analyzing a single resource, this limit appears as a red horizontal line on the resource chart (9). This resource’s usage requires attention.
- Gray — “No assignments”. No activities are assigned to the resource.
You can filter the resource table by indicator values. Click “Resource overallocation filter” (4) on the toolbar and select the values to retain in the table.
You can also sort the table, filter it by attributes, and configure its view (5).
Clear a resource’s checkbox to hide it from the chart, or select it to display the resource. This lets you choose which resources appear on the chart. To select all resource checkboxes, click “Set all checkboxes” (6). To clear them, click “Remove all checkboxes” (7).
To identify activities assigned to the resources selected using checkboxes, click “Select tasks by resources” (8). The corresponding activity checkboxes will be selected in the Work Breakdown Structure.
Resource table pane
Analyzing an overallocated resource
Resources can be displayed in two formats:
- Table (1);
- Bar chart with S-curves (2).
In the bar chart with S-curves view, you can select the display mode:
- Bar chart (3);
- S-curves (4);
- Bar chart with S-curves: enable both modes (3) and (4).
Selecting a resource in the table highlights only that resource on the chart. Click an empty area of the chart to clear the highlight. Selection also works in the opposite direction: selecting a bar on the chart highlights the corresponding resource in the table.
To view a bar’s value, hover over the chart. An arrow appears showing daily resource usage. You can also assess resource usage using the scales on the left for the bar chart and on the right for the S-curve. The scale is dynamic, allowing you to read a bar’s value by moving the cursor up and down.
Enable S-curves to assess cumulative resource data over a specified period. The curve cannot be customized and is generated automatically from resource planning data.
To change the chart’s zoom level, hold down the right mouse button on the timeline and drag right to zoom in or left to zoom out. To move the timeline to a different period, hold down the left mouse button on it and drag in the required direction.
The resource chart is synchronized with the “Gantt chart” and “Daily plan” tabs. Changes to its zoom level or timeline position also apply to those tabs.
Configuring the resource workload chart display
The table view (1) shows the total amount of resources distributed across activities each day. If daily resource usage exceeds the specified hourly usage rate, the cell is highlighted in red (2) to indicate overallocation. If the planned value does not exceed the specified units/time limit, the row is not highlighted.
Resource workload table view